A 3-Day Home Gym Workout Split With an All-in-One Home Gym

A 3-Day Home Gym Workout Split With an All-in-One Home Gym

A professional home gym plan should make your training more focused, not more scattered.

This 3-day workout split gives every session a clear purpose. Instead of trying to touch every muscle group in every workout, each day focuses on two connected muscle groups with enough working sets to create meaningful training stimulus at home.

Your weekly schedule is simple:

· Day 1: Chest and triceps

· Day 2: Back and biceps

· Day 3: Legs and shoulders

The plan uses the Smith Bar, System Lat Pulldown, Low Cable System, Functional Trainer Cable Pulley, Chest-Machine, and Leg Extension/Curl Machine on the Gymusclo Multi-Function Home Gym System. Each day has a clear training priority instead of treating the machine like a list of disconnected exercises.

Know Your Training Stations First

Before you train, understand which station belongs to each movement. This reduces setup time and prevents the dedicated lat pulldown, low cable system, and adjustable functional trainer pulleys from being confused with one another.

 

Figure 1. Gymusclo Multi-Function Home Gym System station map.

Station

Exercises in This Plan

Smith Bar

Smith bench press, Smith squat, Smith straight-leg deadlift, Smith shoulder press

System Lat Pulldown

Lat pulldown

Low Cable System

Seated cable row, seated preacher curl

Functional Trainer Cable Pulley

Triceps pressdown, overhead triceps extension, rope hammer curl, cable lateral raise, core work

Chest-Machine

Seated chest fly

Leg Extension/Curl Machine

Leg extension

Multi Grip Pull Up Bar

Optional hanging knee raise

 

Who This Plan Is For

This is an intermediate-volume home strength plan. It is a good fit if you:

· Can train consistently three days each week.

· Prefer to focus on two muscle groups per session and train them thoroughly.

· Know the basics of resistance training or are willing to learn the correct Smith and cable setup.

· Want to use one all-in-one home gym as your primary strength-training station.

· Can reserve about 60 to 90 minutes for a complete workout.

This is a depth-first split. Each major muscle group has its own weekly session, which suits lifters who prefer focused chest, back, and leg days. If your goal is to train every muscle group twice per week, a four-day upper/lower plan may be a better next step.

If you are new to strength training, complete three working sets per exercise for the first two to three weeks. Build toward the full volume only after your technique and recovery feel consistent.

How to Use This Plan

Train on three non-consecutive days. Monday, Wednesday, and Friday work well, but any schedule with at least one rest day between sessions is fine.

Before each workout, complete 5 to 10 minutes of light warm-up work, followed by two to three gradual warm-up sets for the first Smith movement. The sets in the tables below are working sets; warm-up sets do not count.

Training rules:

· Use loads that leave about 1 to 2 good repetitions in reserve at the end of each set.

· Rest 90 to 120 seconds after main Smith movements.

· Rest 60 to 75 seconds after cable and isolation movements.

· Record your weight, repetitions, and how each exercise felt.

· When every working set reaches the top of its repetition range with stable form, increase the weight slightly next time.

Before any Smith movement, learn the Safety Stoppers and safety-hook positions. The Smith Bar accepts 2-inch weight plates, sold separately.

Day 1: Chest and Triceps

This session is built around chest pressing. Start with a trackable Smith bench press, use the Chest-Machine for controlled chest volume, then finish with direct triceps work.

Exercise

Station

Working Sets

Focus

Smith Bench Press

Smith Bar

5 x 6-8

Main chest strength movement

Seated Chest Fly

Chest-Machine

4 x 10-12

Chest contraction and control

Cable Triceps Pressdown

Functional Trainer Cable Pulley

4 x 10-12

Overall triceps work

Overhead Cable Triceps Extension

Functional Trainer Cable Pulley

4 x 10-12

Long head of the triceps

 

Day 1: Chest and Triceps Training Notes

The Smith bench press is the priority. Warm up with the empty bar or a light load, then set your safety hooks before working sets. The goal is not to rush through five sets. Keep the lowering phase controlled and make each press repeatable.

Do not chase excessive load on the seated chest fly. Keep your shoulders from rolling forward and control the return instead of allowing the machine to rebound.

Use the Functional Trainer Cable Pulley for both triceps exercises and adjust the pulley height as needed. If your torso has to swing back and forth to finish repetitions, reduce the load.

Total working sets: 17, including 9 direct chest sets and 8 direct triceps sets.

Day 2: Back and Biceps

This session combines a vertical pull, a horizontal pull, and two direct biceps movements. The dedicated lat pulldown, low cable system, and functional trainer pulley each have a distinct role.

Exercise

Station

Working Sets

Focus

Lat Pulldown

System Lat Pulldown

5 x 8-12

Lats and vertical pulling strength

Seated Cable Row

Low Cable System

5 x 8-12

Mid-back thickness and horizontal pulling

Seated Preacher Curl

Low Cable System + Preacher Curl Pad

4 x 10-12

Biceps control and contraction

Rope Hammer Curl

Functional Trainer Cable Pulley

4 x 10-12

Biceps and forearms

 

Day 2: Back and Biceps Training Notes

The lat pulldown uses the dedicated System Lat Pulldown, not the Functional Trainer Cable Pulley. Set your seat and leg hold-down first, then drive your elbows down toward your sides. Avoid leaning far back and turning each rep into a body swing.

The seated row uses the Low Cable System. Pause briefly when the handle reaches your torso, then control the return. Keep tension through your back instead of letting your shoulders collapse forward.

Use the Low Cable System and Preacher Curl Pad for preacher curls. For rope hammer curls, use the Functional Trainer Cable Pulley set low. Neither biceps movement should require momentum from your torso.

Total working sets: 18, including 10 direct back sets and 8 direct biceps sets.

Day 3: Legs and Shoulders

This is the highest-volume session of the week. Build leg strength first with Smith squat and hip-hinge work, add leg extensions for quadriceps volume, then complete Smith shoulder pressing and cable lateral raises.

Exercise

Station

Working Sets

Focus

Smith Squat

Smith Bar

5 x 6-8

Quads, glutes, and overall leg strength

Smith Straight-Leg Deadlift

Smith Bar

5 x 8-10

Hamstrings and glutes

Leg Extension

Leg Extension/Curl Machine

4 x 10-15

Quadriceps volume

Smith Shoulder Press

Smith Bar

5 x 6-10

Front delts and overall shoulder pressing strength

Cable Lateral Raise

Functional Trainer Cable Pulley

4 x 12-15

Side delts

 

Day 3: Legs and Shoulders Training Notes

The Smith squat is the lead movement. Use a foot position that keeps your feet planted, knees tracking naturally, and torso stable. Do not trade back or knee control for extra depth.

On the Smith straight-leg deadlift, feel your hips move back and your hamstrings lengthen. Keep the bar close, maintain a slight knee bend, and stop the descent when you can no longer control your torso position.

Use the Leg Extension/Curl Machine after the two main leg movements to add focused quadriceps work.

The shoulder press uses the Smith Bar. Adjust the backrest and Safety Stoppers so the pressing path is controlled. The cable lateral raise uses the Functional Trainer Cable Pulley set low. Choose light to moderate resistance and avoid shrugging, swinging, or leaning your body through the movement.

Total working sets: 23, including 14 direct leg sets and 9 direct shoulder sets.

Optional Core Finishers

Core work does not need to be forced into every session. Add one option after Day 1 or Day 3 once or twice each week:

Exercise

Station

Working Sets

Cable Crunch

Functional Trainer Cable Pulley

4 x 10-15

Cable Pallof Press

Functional Trainer Cable Pulley

4 x 10-12 per side

Hanging Knee Raise

Multi Grip Pull Up Bar

4 x 8-12

Front Plank

Bodyweight

4 x 30-45 seconds

 

The goal of core work is stable, controlled movement. Do not rush through it just because it is at the end of your workout.

How to Progress for 6 to 8 Weeks

Effective training does not require a new routine every week. It requires trackable improvement within a stable routine.

Use double progression:

· Start near the bottom of each exercise's repetition range.

· Add repetitions from week to week with the same weight.

· When every working set reaches the top of the range with stable form, add a small amount of weight.

· After adding weight, return to the lower end of the range and build again.

For example, once you can complete all five Smith bench press sets for eight controlled repetitions, add a small amount of weight next time. Returning to six repetitions after that increase is normal. It is the start of the next progression cycle.

Run this plan for 6 to 8 weeks. You can then change selected accessory movements, such as replacing rope hammer curls with single-arm cable curls. Keep the core Smith squat, bench press, lat pulldown, and seated row long enough to track meaningful progress.

Build a Focused Home Training Routine

The value of an all-in-one home gym is not how many exercises it can display. Its value is whether it lets you follow a complete, structured training plan in one consistent space.

This 3-day split gives you a dedicated chest and triceps day, back and biceps day, and legs and shoulders day. Each session focuses on two connected muscle groups with 4 to 5 working sets for every planned exercise.

The Gymusclo Multi-Function Home Gym System brings the Smith Bar, System Lat Pulldown, Low Cable System, Functional Trainer Cable Pulley, Chest-Machine, and Leg Extension/Curl Machine together in one strength-training station. Track your work, progress gradually, and let consistent sessions build long-term strength.

Explore the product: Gymusclo Multi-Function Home Gym System

Frequently Asked Questions

Is a 3-day workout split enough to build strength and muscle at home?

Yes. A three-day split can build strength when you train consistently, complete challenging working sets, and progress your load or repetitions over time. This plan concentrates training volume on two priority muscle groups each session.

Can beginners use the full 4 to 5 working sets right away?

Not usually. Beginners should use three working sets per exercise for the first two to three weeks and focus on learning the machine setup, movement path, and recovery rhythm. Add volume after training feels stable and joint discomfort is not persistent.

How long does each workout take?

The chest and triceps day and back and biceps day usually take 60 to 75 minutes. The legs and shoulders day has more working sets and usually takes 75 to 90 minutes. Warm-up, rest periods, and station changes affect the final time.

What if the 150 lb cable stack no longer feels challenging?

First, use the full 1:1 cable resistance and improve control. You can add repetitions, slow the lowering phase, or use appropriate unilateral variations. For Smith movements, add 2-inch weight plates separately.

Back to blog